Auction record summary
This page is the archived Copart record for the 2015 BMW M4 with VIN WBS3R9C59FK331552, listed as lot 60913596 at the Tx - Austin yard (Tx - Austin, New Braunfels, Texas, USA). The highest bid AllCarHistory recorded before the auction closed was $15,900, captured as of October 24, 2026; this is not a confirmed final sale price, and auction fees, transport and repairs are not included. The auction was scheduled for October 27, 2026, and the lot status at the time of recording was "On sale". Primary damage noted by the auction: Minor dents/scratches; running condition: Starts and drives. The odometer reading was 51,420 mi. Listed specifications: Yellow, Coupe, 3.0l 6 engine, 6 cylinders, Automatic transmission, RWD, Gasoline. Keys: Yes. The auction also listed a market value of $23,900. AllCarHistory does not sell vehicles and does not take bids: the data above is a snapshot of the Copart listing, kept so that buyers, importers and insurers can check this VIN's auction history later. Compare it with the photos in the gallery and with other BMW M4 lots in the archive before relying on it.








